Burning Man Exodus, Part II
Submitted by brad on Wed, 2009-09-16 14:05Two years ago, I discussed solutions for Burning Man Exodus. The problem: Get 45,000 people off the playa in 2 days, 95% of them taking a single highway south which goes through a small town which has a chokepoint capacity of about 450 cars/hour. Quite often wait times to get onto the road are 4 hours or more, though this year things were smoother (perhaps due to a lower attendance) and the number of people with 4 hour waits was lower.




I recently met Chris Tacklind, who has a design-stage startup called
We want low current plugs to be small, and heavy current plugs to be big. I suggest a triangular pin shape, something like what is shown here. In this design, two main pins can only go in one way. The lower triangle is an optional ground -- but see notes on grounding below.