New BCEC convention center, yet unwired
Attending a convention in the new Boston Convention and Exhibition Center (BCEC) I found one thing very surprising. The show organizer had to install wireless APs all around the building on poles, with long wires leading to power and ethernet. How can a new convention center not already be set up for wireless? I will admit, in some ways it is correct to anticipate that the radios that would do the work will be quickly obsolete, and thus should not be so permanently installed, but it seems crazy to me that a new CC would not have been built with spaces in the ceilings or upper walls ready for some sort of wireless network.
The meeting room halls also don't have tons of power jacks in the floors. Today, at modern conventions, everybody brings laptops and they want to plug them in. Better conventions in older halls run extension cords and power strips, and there are a few of those here, but why should a new convention center not be ready to go?
Add new comment